| 篇名/題名: | Application of Genetic Algorithm and Fuzzy Gantt Chart to Project Scheduling with Resource Constraints |
| 摘要: | Project scheduling with resource constraints is one of the most challenging optimization problems because of the complexity in estimating the resource requirement. This work aims at the application of fuzzy Gantt chart (FGC) and genetic algorithm (GA) to calculate optimal activity in project scheduling. Activity durations are considered adjustable for the optimal resource assignment under the constraints. GA determines not only the activity priority but also the activity duration within resource constraints. Numerical results of an example show that this application can effectively reduce the maximum resource input from 94 to 40 men with similar project makespan. |
| 類型: | 期刊論文 |
| 著作語言: | 英文 |
| 關鍵詞: | project scheduling, resource constraints, genetic algorithm, fuzzy Gantt chart |
| 作者: | 作者: 劉育釧、Hong-Mei Gao、Shih-Ming Yang、Chun-Yung Chuang
|
| 學校系所: | 資訊管理系 |
| 卷期: | Lecture notes on Artificial Intelligence;vol. 8589 卷 |
| 頁碼: | 241-252 |